Plan |
ALL ELEV A BAY WDW- 73900 |
Contract Price |
91 |
Lath |
5 |
Lath Burden |
1 |
Stucco |
5 |
Stuco Burden |
1 |
Popout |
15 |
Popout Burden |
3 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
14 |
Stucco Material |
5 |
Popout Material |
32 |
|
|
1"x20 gauge Wire |
0 |
1" FOAM SHEETS |
1 |
9/16" FOAM |
0 |
60 MIN BLACK PAPER |
0 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
0 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
0 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
2 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
0 |
STAPLES |
2 |
CAULKING |
0 |
MESH TAPE |
0 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
0 |
FOAMTEK (80 SF/BAG) |
1 |
DRYBOND (50 SF/BAG) |
1 |
PLASTIC CEMENT |
0 |
SAND BAGS |
0 |
PLASTIC & TAPE |
2 |
|
|
2x4 |
6 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
2 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
ALL ELEV B BAY WDW- 73900 |
Contract Price |
91 |
Lath |
5 |
Lath Burden |
1 |
Stucco |
5 |
Stuco Burden |
1 |
Popout |
15 |
Popout Burden |
3 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
14 |
Stucco Material |
5 |
Popout Material |
32 |
|
|
1"x20 gauge Wire |
0 |
1" FOAM SHEETS |
1 |
9/16" FOAM |
0 |
60 MIN BLACK PAPER |
0 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
0 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
0 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
2 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
0 |
STAPLES |
2 |
CAULKING |
0 |
MESH TAPE |
0 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
0 |
FOAMTEK (80 SF/BAG) |
1 |
DRYBOND (50 SF/BAG) |
1 |
PLASTIC CEMENT |
0 |
SAND BAGS |
0 |
PLASTIC & TAPE |
2 |
|
|
2x4 |
4 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
2 |
Band 501 AD |
1 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
1 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
1 |
Wall Band @ EAVE B 8/A6.00 |
1 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
ALL ELEV C BAY WDW- 73900 |
Contract Price |
91 |
Lath |
5 |
Lath Burden |
1 |
Stucco |
5 |
Stuco Burden |
1 |
Popout |
15 |
Popout Burden |
3 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
14 |
Stucco Material |
5 |
Popout Material |
32 |
|
|
1"x20 gauge Wire |
0 |
1" FOAM SHEETS |
1 |
9/16" FOAM |
0 |
60 MIN BLACK PAPER |
0 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
0 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
0 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
2 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
0 |
STAPLES |
2 |
CAULKING |
0 |
MESH TAPE |
0 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
0 |
FOAMTEK (80 SF/BAG) |
1 |
DRYBOND (50 SF/BAG) |
1 |
PLASTIC CEMENT |
0 |
SAND BAGS |
0 |
PLASTIC & TAPE |
2 |
|
|
2x4 |
5 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
1 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
1 |
EAVE C 9/A6.00 (shape) |
1 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x5926-1 A BR 4 - 73510 |
Contract Price |
978 |
Lath |
80 |
Lath Burden |
17 |
Stucco |
180 |
Stuco Burden |
38 |
Popout |
55 |
Popout Burden |
12 |
Scaffold |
126 |
Scaffold Burden |
26 |
|
|
Lath Material |
379 |
Stucco Material |
251 |
Popout Material |
238 |
|
|
1"x20 gauge Wire |
3 |
1" FOAM SHEETS |
56 |
9/16" FOAM |
13 |
60 MIN BLACK PAPER |
7 |
R-TEK GABLE GUARD |
-1 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
0 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
0 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
4 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
97 |
CAULKING |
5 |
MESH TAPE |
2 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
9 |
FOAMTEK (80 SF/BAG) |
9 |
DRYBOND (50 SF/BAG) |
3 |
PLASTIC CEMENT |
5 |
SAND BAGS |
42 |
PLASTIC & TAPE |
97 |
|
|
2x4 |
16 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
3 |
4x4 End 1 |
4 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
1 |
EAVE A 7/A6.00 - 12" |
9 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x5926-1 B BR 4 - 73510 |
Contract Price |
978 |
Lath |
80 |
Lath Burden |
17 |
Stucco |
180 |
Stuco Burden |
38 |
Popout |
135 |
Popout Burden |
28 |
Scaffold |
126 |
Scaffold Burden |
26 |
|
|
Lath Material |
519 |
Stucco Material |
374 |
Popout Material |
263 |
|
|
1"x20 gauge Wire |
3 |
1" FOAM SHEETS |
56 |
9/16" FOAM |
13 |
60 MIN BLACK PAPER |
7 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
15 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
0 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
4 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
97 |
CAULKING |
5 |
MESH TAPE |
2 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
9 |
FOAMTEK (80 SF/BAG) |
9 |
DRYBOND (50 SF/BAG) |
3 |
PLASTIC CEMENT |
5 |
SAND BAGS |
42 |
PLASTIC & TAPE |
97 |
|
|
2x4 |
8 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
46 |
Band 501 AD |
5 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
6 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
16 |
Wall Band @ EAVE B 8/A6.00 |
16 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x5926-1 C BR 4 - 73510 |
Contract Price |
978 |
Lath |
80 |
Lath Burden |
17 |
Stucco |
180 |
Stuco Burden |
38 |
Popout |
80 |
Popout Burden |
17 |
Scaffold |
126 |
Scaffold Burden |
26 |
|
|
Lath Material |
534 |
Stucco Material |
368 |
Popout Material |
367 |
|
|
1"x20 gauge Wire |
3 |
1" FOAM SHEETS |
56 |
9/16" FOAM |
13 |
60 MIN BLACK PAPER |
7 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
16 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
0 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
4 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
97 |
CAULKING |
5 |
MESH TAPE |
2 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
9 |
FOAMTEK (80 SF/BAG) |
9 |
DRYBOND (50 SF/BAG) |
3 |
PLASTIC CEMENT |
5 |
SAND BAGS |
42 |
PLASTIC & TAPE |
97 |
|
|
2x4 |
9 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
9 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
17 |
EAVE C 9/A6.00 (shape) |
17 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x5926-1 A BR 4 - 73511 |
Contract Price |
2223 |
Lath |
90 |
Lath Burden |
19 |
Stucco |
200 |
Stuco Burden |
42 |
Popout |
55 |
Popout Burden |
12 |
Scaffold |
126 |
Scaffold Burden |
26 |
|
|
Lath Material |
516 |
Stucco Material |
386 |
Popout Material |
370 |
|
|
1"x20 gauge Wire |
3 |
1" FOAM SHEETS |
68 |
9/16" FOAM |
15 |
60 MIN BLACK PAPER |
11 |
R-TEK GABLE GUARD |
-2 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
0 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
0 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
4 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
110 |
CAULKING |
6 |
MESH TAPE |
3 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
10 |
FOAMTEK (80 SF/BAG) |
14 |
DRYBOND (50 SF/BAG) |
9 |
PLASTIC CEMENT |
6 |
SAND BAGS |
48 |
PLASTIC & TAPE |
110 |
|
|
2x4 |
12 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
3 |
4x4 End 1 |
4 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
1 |
EAVE A 7/A6.00 - 12" |
16 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x5926-1 B BR 4 - 73511 |
Contract Price |
2223 |
Lath |
90 |
Lath Burden |
19 |
Stucco |
200 |
Stuco Burden |
42 |
Popout |
135 |
Popout Burden |
28 |
Scaffold |
126 |
Scaffold Burden |
26 |
|
|
Lath Material |
709 |
Stucco Material |
543 |
Popout Material |
344 |
|
|
1"x20 gauge Wire |
3 |
1" FOAM SHEETS |
68 |
9/16" FOAM |
15 |
60 MIN BLACK PAPER |
11 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
21 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
0 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
4 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
110 |
CAULKING |
6 |
MESH TAPE |
3 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
10 |
FOAMTEK (80 SF/BAG) |
14 |
DRYBOND (50 SF/BAG) |
9 |
PLASTIC CEMENT |
6 |
SAND BAGS |
48 |
PLASTIC & TAPE |
110 |
|
|
2x4 |
8 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
62 |
Band 501 AD |
5 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
6 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
22 |
Wall Band @ EAVE B 8/A6.00 |
22 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x5926-1 C BR 4 - 73511 |
Contract Price |
2223 |
Lath |
90 |
Lath Burden |
19 |
Stucco |
200 |
Stuco Burden |
42 |
Popout |
80 |
Popout Burden |
17 |
Scaffold |
126 |
Scaffold Burden |
26 |
|
|
Lath Material |
714 |
Stucco Material |
503 |
Popout Material |
471 |
|
|
1"x20 gauge Wire |
3 |
1" FOAM SHEETS |
68 |
9/16" FOAM |
15 |
60 MIN BLACK PAPER |
11 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
21 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
0 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
4 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
110 |
CAULKING |
6 |
MESH TAPE |
3 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
10 |
FOAMTEK (80 SF/BAG) |
14 |
DRYBOND (50 SF/BAG) |
9 |
PLASTIC CEMENT |
6 |
SAND BAGS |
48 |
PLASTIC & TAPE |
110 |
|
|
2x4 |
8 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
12 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
22 |
EAVE C 9/A6.00 (shape) |
22 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x5035-1 A BALCONY - 16002 |
Contract Price |
909 |
Lath |
80 |
Lath Burden |
17 |
Stucco |
125 |
Stuco Burden |
26 |
Popout |
0 |
Popout Burden |
0 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
326 |
Stucco Material |
186 |
Popout Material |
0 |
|
|
1"x20 gauge Wire |
2 |
1" FOAM SHEETS |
31 |
9/16" FOAM |
6 |
60 MIN BLACK PAPER |
4 |
R-TEK GABLE GUARD |
5 |
TEAL TAPE |
1 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
3 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
9 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
23 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
0 |
STAPLES |
68 |
CAULKING |
3 |
MESH TAPE |
1 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
6 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
0 |
PLASTIC CEMENT |
3 |
SAND BAGS |
27 |
PLASTIC & TAPE |
68 |
|
|
2x4 |
0 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
-2 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x5035-1 B BALCONY - 16002 |
Contract Price |
909 |
Lath |
80 |
Lath Burden |
17 |
Stucco |
125 |
Stuco Burden |
26 |
Popout |
0 |
Popout Burden |
0 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
326 |
Stucco Material |
186 |
Popout Material |
0 |
|
|
1"x20 gauge Wire |
2 |
1" FOAM SHEETS |
31 |
9/16" FOAM |
6 |
60 MIN BLACK PAPER |
4 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
3 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
9 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
23 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
0 |
STAPLES |
68 |
CAULKING |
3 |
MESH TAPE |
1 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
6 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
0 |
PLASTIC CEMENT |
3 |
SAND BAGS |
27 |
PLASTIC & TAPE |
68 |
|
|
2x4 |
0 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
-12 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
-4 |
Wall Band @ EAVE B 8/A6.00 |
-4 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x5035-1 C BALCONY - 16002 |
Contract Price |
909 |
Lath |
80 |
Lath Burden |
17 |
Stucco |
125 |
Stuco Burden |
26 |
Popout |
0 |
Popout Burden |
0 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
326 |
Stucco Material |
186 |
Popout Material |
0 |
|
|
1"x20 gauge Wire |
2 |
1" FOAM SHEETS |
31 |
9/16" FOAM |
6 |
60 MIN BLACK PAPER |
4 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
3 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
9 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
23 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
0 |
STAPLES |
68 |
CAULKING |
3 |
MESH TAPE |
1 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
6 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
0 |
PLASTIC CEMENT |
3 |
SAND BAGS |
27 |
PLASTIC & TAPE |
68 |
|
|
2x4 |
0 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
-4 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x6040-1 A BALCONY - 16002 |
Contract Price |
679 |
Lath |
60 |
Lath Burden |
13 |
Stucco |
105 |
Stuco Burden |
22 |
Popout |
0 |
Popout Burden |
0 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
216 |
Stucco Material |
153 |
Popout Material |
0 |
|
|
1"x20 gauge Wire |
1 |
1" FOAM SHEETS |
32 |
9/16" FOAM |
7 |
60 MIN BLACK PAPER |
3 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
2 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
4 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
15 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
0 |
STAPLES |
56 |
CAULKING |
3 |
MESH TAPE |
1 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
5 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
0 |
PLASTIC CEMENT |
3 |
SAND BAGS |
24 |
PLASTIC & TAPE |
56 |
|
|
2x4 |
0 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
-3 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x6040-1 B BALCONY - 16002 |
Contract Price |
679 |
Lath |
60 |
Lath Burden |
13 |
Stucco |
105 |
Stuco Burden |
22 |
Popout |
0 |
Popout Burden |
0 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
216 |
Stucco Material |
153 |
Popout Material |
0 |
|
|
1"x20 gauge Wire |
1 |
1" FOAM SHEETS |
32 |
9/16" FOAM |
7 |
60 MIN BLACK PAPER |
3 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
2 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
4 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
15 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
0 |
STAPLES |
56 |
CAULKING |
3 |
MESH TAPE |
1 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
5 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
0 |
PLASTIC CEMENT |
3 |
SAND BAGS |
24 |
PLASTIC & TAPE |
56 |
|
|
2x4 |
0 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
-9 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
-3 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x6040-1 C BALCONY - 16002 |
Contract Price |
679 |
Lath |
60 |
Lath Burden |
13 |
Stucco |
105 |
Stuco Burden |
22 |
Popout |
0 |
Popout Burden |
0 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
216 |
Stucco Material |
153 |
Popout Material |
0 |
|
|
1"x20 gauge Wire |
1 |
1" FOAM SHEETS |
32 |
9/16" FOAM |
7 |
60 MIN BLACK PAPER |
3 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0 |
PAPERBACK HI-RIB |
2 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
4 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
15 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
0 |
STAPLES |
56 |
CAULKING |
3 |
MESH TAPE |
1 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
5 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
0 |
PLASTIC CEMENT |
3 |
SAND BAGS |
24 |
PLASTIC & TAPE |
56 |
|
|
2x4 |
0 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
-3 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x6040-1 A 3 CAR GAR - 709 |
Contract Price |
1179 |
Lath |
70 |
Lath Burden |
15 |
Stucco |
130 |
Stuco Burden |
27 |
Popout |
20 |
Popout Burden |
4 |
Scaffold |
28 |
Scaffold Burden |
6 |
|
|
Lath Material |
338 |
Stucco Material |
185 |
Popout Material |
197 |
|
|
1"x20 gauge Wire |
2 |
1" FOAM SHEETS |
40 |
9/16" FOAM |
6 |
60 MIN BLACK PAPER |
5 |
R-TEK GABLE GUARD |
1 |
TEAL TAPE |
1 |
BITUTHENE (YARD) |
0.1 |
PAPERBACK HI-RIB |
1 |
2.5# METAL LATH |
1 |
1 3/8" No. 7 SILL SCREED |
6 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
3 |
1 COAT CORNER AID |
8 |
1 COAT ARCH AID |
1 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
67 |
CAULKING |
5 |
MESH TAPE |
2 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
6 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
1 |
PLASTIC CEMENT |
4 |
SAND BAGS |
18 |
PLASTIC & TAPE |
72 |
|
|
2x4 |
1 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
1 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
2 |
EAVE A 7/A6.00 - 12" |
7 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x6040-1 B 3 CAR GAR - 709 |
Contract Price |
1427 |
Lath |
80 |
Lath Burden |
17 |
Stucco |
130 |
Stuco Burden |
27 |
Popout |
140 |
Popout Burden |
29 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
430 |
Stucco Material |
258 |
Popout Material |
186 |
|
|
1"x20 gauge Wire |
2 |
1" FOAM SHEETS |
26 |
9/16" FOAM |
5 |
60 MIN BLACK PAPER |
3 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0.1 |
PAPERBACK HI-RIB |
25 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
6 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
3 |
1 COAT CORNER AID |
18 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
78 |
CAULKING |
6 |
MESH TAPE |
1 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
7 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
3 |
PLASTIC CEMENT |
4 |
SAND BAGS |
21 |
PLASTIC & TAPE |
78 |
|
|
2x4 |
1 |
2x6 |
0 |
3x4 |
11 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
31 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
13 |
Wall Band @ EAVE B 8/A6.00 |
13 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x6040-1 C 3 CAR GAR - 709 |
Contract Price |
1430 |
Lath |
80 |
Lath Burden |
17 |
Stucco |
120 |
Stuco Burden |
25 |
Popout |
80 |
Popout Burden |
17 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
432 |
Stucco Material |
266 |
Popout Material |
257 |
|
|
1"x20 gauge Wire |
2 |
1" FOAM SHEETS |
26 |
9/16" FOAM |
5 |
60 MIN BLACK PAPER |
3 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0.1 |
PAPERBACK HI-RIB |
25 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
6 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
3 |
1 COAT CORNER AID |
17 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
75 |
CAULKING |
6 |
MESH TAPE |
1 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
7 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
3 |
PLASTIC CEMENT |
4 |
SAND BAGS |
21 |
PLASTIC & TAPE |
75 |
|
|
2x4 |
0 |
2x6 |
0 |
3x4 |
11 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
12 |
EAVE C 9/A6.00 (shape) |
12 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x6040-1 A CASITA - 70905 |
Contract Price |
1323 |
Lath |
80 |
Lath Burden |
17 |
Stucco |
160 |
Stuco Burden |
34 |
Popout |
20 |
Popout Burden |
4 |
Scaffold |
28 |
Scaffold Burden |
6 |
|
|
Lath Material |
384 |
Stucco Material |
214 |
Popout Material |
197 |
|
|
1"x20 gauge Wire |
2 |
1" FOAM SHEETS |
49 |
9/16" FOAM |
7 |
60 MIN BLACK PAPER |
6 |
R-TEK GABLE GUARD |
1 |
TEAL TAPE |
1 |
BITUTHENE (YARD) |
0.1 |
PAPERBACK HI-RIB |
0 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
7 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
9 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
81 |
CAULKING |
8 |
MESH TAPE |
2 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
7 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
1 |
PLASTIC CEMENT |
5 |
SAND BAGS |
21 |
PLASTIC & TAPE |
86 |
|
|
2x4 |
1 |
2x6 |
0 |
3x4 |
0 |
2x4 End 1 |
1 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
2 |
EAVE A 7/A6.00 - 12" |
7 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x6040-1 A CASITA - 70906 |
Contract Price |
1580 |
Lath |
90 |
Lath Burden |
19 |
Stucco |
160 |
Stuco Burden |
34 |
Popout |
140 |
Popout Burden |
29 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
483 |
Stucco Material |
287 |
Popout Material |
185 |
|
|
1"x20 gauge Wire |
2 |
1" FOAM SHEETS |
36 |
9/16" FOAM |
6 |
60 MIN BLACK PAPER |
5 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0.1 |
PAPERBACK HI-RIB |
22 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
7 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
18 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
92 |
CAULKING |
9 |
MESH TAPE |
2 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
8 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
3 |
PLASTIC CEMENT |
5 |
SAND BAGS |
24 |
PLASTIC & TAPE |
92 |
|
|
2x4 |
1 |
2x6 |
0 |
3x4 |
10 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
31 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
13 |
Wall Band @ EAVE B 8/A6.00 |
13 |
EAVE C 9/A6.00 (fascia) |
0 |
EAVE C 9/A6.00 (shape) |
0 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|
Plan |
x6040-1 A CASITA - 70907 |
Contract Price |
1563 |
Lath |
90 |
Lath Burden |
19 |
Stucco |
150 |
Stuco Burden |
32 |
Popout |
80 |
Popout Burden |
17 |
Scaffold |
0 |
Scaffold Burden |
0 |
|
|
Lath Material |
484 |
Stucco Material |
295 |
Popout Material |
255 |
|
|
1"x20 gauge Wire |
2 |
1" FOAM SHEETS |
36 |
9/16" FOAM |
6 |
60 MIN BLACK PAPER |
5 |
R-TEK GABLE GUARD |
0 |
TEAL TAPE |
0 |
BITUTHENE (YARD) |
0.1 |
PAPERBACK HI-RIB |
22 |
2.5# METAL LATH |
0 |
1 3/8" No. 7 SILL SCREED |
7 |
7/8" No. 7 SILL SCREED |
0 |
1/2" J-METAL NO HOLES |
0 |
1 COAT CORNER AID |
17 |
1 COAT ARCH AID |
0 |
BUTYL TAPE (YARD) |
1 |
STAPLES |
89 |
CAULKING |
8 |
MESH TAPE |
2 |
1/2"x1" REVEAL SCREED |
0 |
|
|
OMEGA concentrate |
8 |
FOAMTEK (80 SF/BAG) |
0 |
DRYBOND (50 SF/BAG) |
3 |
PLASTIC CEMENT |
5 |
SAND BAGS |
24 |
PLASTIC & TAPE |
89 |
|
|
2x4 |
0 |
2x6 |
0 |
3x4 |
10 |
2x4 End 1 |
0 |
2x6 End 1 |
0 |
Corb 1 @ Eave B 6x15x8 |
0 |
Band 501 AD |
0 |
Shape D3 |
0 |
Shape D4 |
0 |
2x3 |
0 |
2x4 Back-cut Arch |
0 |
2x6 Back-cut Arch |
0 |
2x4 End 2 |
0 |
4x4 |
0 |
4x4 End 1 |
0 |
4" 1/2 Round |
0 |
2x8 |
0 |
2x4 o/ 2x8 |
0 |
2x6 o/ 2x8 |
0 |
2x6 o/ 2x8 Back-cut Arch |
0 |
1x24 Wainscot |
0 |
2x16 Band (quoin) |
0 |
Keystone 1 (9x11x6) |
0 |
Outlooker 6x10x8 |
0 |
4x6 |
0 |
2x4 Scored |
0 |
2x8 Scored |
0 |
Hdr 6040 C |
0 |
3-pipe unit |
0 |
EAVE A 7/A6.00 - 12" |
0 |
EAVE B 8/A6.00 (fascia) |
0 |
Wall Band @ EAVE B 8/A6.00 |
0 |
EAVE C 9/A6.00 (fascia) |
12 |
EAVE C 9/A6.00 (shape) |
12 |
2x2 o/ 2x8 |
0 |
2x2 o/ 2x8 B/C Arch |
0 |
|
|